VAL Avionics NAV 2000 Guía de instalación Pagina 300

  • Descarga
  • Añadir a mis manuales
  • Imprimir
  • Pagina
    / 401
  • Tabla de contenidos
  • SOLUCIÓN DE PROBLEMAS
  • MARCADORES
  • Valorado. / 5. Basado en revisión del cliente
Vista de pagina 299
SV-COM-C25 Installation, Configuration, and Testing
16-14 SkyView System Installation Guide - Revision R
Figure 106 - Headset Jack Schematic Interpretation
Power/Ground Input
The SV-COM-C25 requires 10-30V DC. For wire runs from power distribution to the SV-COM-
425 up to 6’, 22 AWG wire is sufficient for power and ground wires. For wire runs from power
distribution to the SV-COM-425 longer than 6’, 20 AWG wire is recommended for power and
ground wires. For the cable between the SV-COM-425 and the SV-COM-PANEL, 22 AWG power
and ground wire is sufficient. Use a 5 Amp fuse or circuit breaker for power supply protection to
each SV-COM-C25.
Power Specifications
Approximate current
consumption at 12 volts DC
Approximate current
consumption at 24 volts DC
SV-COM-C25 Transmit
3.0 amps average
1.5 amps average
SV-COM-C25 Receive
0.2 amps average
0.1 amps
Table 55 - SV-COM-C25 Power Consumption
Vista de pagina 299
1 2 ... 295 296 297 298 299 300 301 302 303 304 305 ... 400 401

Comentarios a estos manuales

Sin comentarios